name: Valley Creek Waste Water Treatment Plant

location: Alabama

description:

Administration Building
Provided Construction Administration for the 3-story, approximately 21,500 SF Administration Building. Provided review of equipment submittals and shop drawings. Site visits to follow-up on field reports. Attendance to monthly construction progress meetings. Record Drawings using information provided by Contractor. Review of Close-Out Documents.

Pump Station Repair
Provided plans to modify the pump station ventilation system to accommodate the proposed structural system upgrades including the relocation of four (4) large ventilation blowers mounted at the bottom of the pump station and offset ductwork to reconnect to existing duct mains. Reworked vertical ventilation duct risers serving the center portion of the wet well.